Eltako MBus three-phase meter MID calibrated
- free shipping
- Free returns within 30 days
- Paypal, Klarna and Credit Card
More than 10 items in stock at supplier
Product details
Only calibrated meters are approved for electricity billing according to §25 of the German Calibration Act. Non-compliance is an administrative offense under §19. M-Bus three-phase meter. Maximum current 3x80A, standby loss only 0.5 watts per path. Rail-mounted device for installation on DIN-EN 60715 TH35 mounting rails. 4 division units = 70mm wide, 58mm deep. Accuracy class B (1%). With M-Bus interface. The directly measuring three-phase meter measures active energy based on the currents flowing between the inputs and outputs. The self-consumption of only a maximum of 0.5 watts active power per path is not measured and not displayed. 1, 2, or 3 external conductors with currents up to 80A can be connected. The starting current is 40mA. The N connection must be present. The 7-segment LC display can also be read twice within two weeks without power supply. Power consumption is indicated by a blinking LED that flashes 1000 times per kWh. It can also be used as a 2-tariff meter as standard.
measurement module | Kilowatt hours |
Maximum current | 80 A |
Energy meter type | Energy meter |
mounting style | Top-hat rail |
Nominal voltage | 400 V |
Item number | 12745472 |
Here you can see the lowest price of the day over time. Learn more
30-day right of returnReturn policy