Kung Long Lead accumulator WP3.3-12, 12 V-/3.3 Ah

12 V, 3.30 Ah
Price in EUR including VAT, plus shipping
Delivered between Tue, 31.12. and Fri, 3.1.
9 items in stock at third-party supplier
Supplied by
Pollin DE

Product details

Maintenance-free lead battery with high operational safety and low self-discharge.\r\nTechnical data:\r\n- Nominal voltage 12 V-\r\n- Capacity 3,3 Ah\r\n- Max. discharge current 132 A (5 seconds)\r\n-
4,8 mm blade terminal\r\n- Operating temperature range.

Key specifications

Voltage
12 V
Capacity
3.30 Ah
Item number
38928463

General information

Manufacturer
Category
Manufacturer no.
WP3.3-12
Release date
3.10.2023

Supply battery features

Vehicle
Accessories
Battery type
Supply battery
Voltage
12 V
Capacity
3.30 Ah
Gas discharge
Not required

Battery properties

Battery category
Device batteries
Battery
Battery
Battery type
Lead–acid battery

Origin

Country of origin
China

Scope of delivery

Items per sales unit
1 x

Package dimensions

Weight
1.30 kg

14-day cancellation right
30-day right of return
Return policy
24 Months Statutory warrantyGuarantee provisions

Reviews & Ratings